About This Project
LOCATION:
Al Mushrif, Dubai, UAE
COMPLETION DATE:
December 2001
END USER:
Dubai Electricity & Water Authority (DEWA)
CONTRACTOR – CONSULTANT:
Target & Jimma
PIPE SYSTEMS CONSULTING ENGINEERS:
Dynaflow International Inc., U.A.E.
PIPE SYSTEMS UTILITY:
Pumping Stations
DESCRIPTION:
Main pumping station for desalination water for the entire Northern Emirates of Dubai.
RESIN USED:
SWANCOR 901 Epoxy Vinyl Ester Resin
PIPE SYSTEMS:
The piping system included main transmission lines (GRP, DN 1200mm), including complex spool to suit and supplied system also included Glass Reinforced Vinylester (GRV) pipes and fittings ranging in diameter from 100mm to 1200mm , with design pressure of 10 bars and stiffness of 1000 N/m2.a wide range of accessories, flexible joints, fittings and joining techniques complemented the system, which included a combination of Fiber Cement Pipes DN 1200mm with the GRP system.