Renovation work for waste water effluent pipes

Renovation work for waste water effluent pipes

RENOVACIÓN DE TUBERÍAS DE AGUAS RESIDUALES

USER:

Taiwan Kwang-Tien Industrial Area Waste Water Treatment Plant (Work completed in September 1999)

 

SERVICE:

Waste water effluent at room temperature.

 

DIMENSION:

Pipes inner diameter 200-350mm, length 1544m.

 

RESIN USED:

SWANCOR 901-2T

 

FABRICATION METHOD:

SNew Technology of Inversion Liner and Cured-in-place Rehabilitation were used. The disadvantages of traditional repairing method can be avoided. 1. Non-woven fabric pipes were fully rinsed with resin before proceeding. 2. Insert the pipes into old concrete pipes with Inversion Liner Method. 3. Pump hot water into the fabric pipes for cure.

MANUFACTURER

King-Tech Rehabilitation Co., Ltd